
.ea6ba1ae.webp&w=3840&q=75&dpl=dpl_JDFE7YVYGAbPNAAQX7CGxuvHyzfS)
No Surgery
Quick & Painless Procedure
100% Real Hair
Only One Sitting Required

No Surgery
Quick & Painless Procedure
100% Real Hair
Only One Sitting Required

.7f7bed1a.webp&w=3840&q=100&dpl=dpl_JDFE7YVYGAbPNAAQX7CGxuvHyzfS)
See Your
Look with Hair
Try the world‘s first
Generator for balding men.
See Your
Look with Hair
Try the world‘s first
Generator for balding men.

.6c6979d0.webp&w=3840&q=100&dpl=dpl_JDFE7YVYGAbPNAAQX7CGxuvHyzfS)
Be Hair-Free,
Pain-Free
Opt for Laser Hair Reduction Today!
Be Hair-Free,
Pain-Free
Opt for Laser Hair Reduction Today!

Ready to transform?



Whether it's hair loss, skin concerns, or something you've been silently struggling with—we're here to help. With over 10 lakh happy clients and 37 years of experience pioneering treatments like permanent hair removal and hair replacement, you're in the best hands. So take the first step—quietly, confidentially, and at your pace. We'll walk with you, every step of the way.
AI Hair Generator
Curious how you‘d look with a full head of hair? Now you can see it before doing anything. Our AI Hair Generator is designed specifically for men experiencing balding—and yes, it‘s the first of its kind made in India by our own expert team. Just upload a photo, and our tool will show you realistic results you won‘t believe are AI-generated.
AI Graft Assessment
Considering a hair transplant but unsure if you actually need it? Wondering about costs or other options? Our AI Hair Analysis gives you clear answers—based on your current hair condition. You‘ll receive a detailed report, recommended treatments, and personalized product suggestions. All in a few clicks.
Solutions for Every Concern
From acne to aging, from hair fall to hair transplants—no matter your concern, we have a treatment that's right for you. Backed by science, powered by technology, and delivered with care.

Hair Transplant
Restore your natural hairline with our expert-performed hair transplants. Using advanced techniques like FUE, we ensure permanent.

Hair Patch
Get an instant makeover with our undetectable, non-surgical hair patches. Custom-designed to match your scalp.

Laser Hair Reduction
Say goodbye to unwanted hair with advanced laser hair reduction. Safe, effective, and virtually painless.

Hair Transplant
Restore your natural hairline with our expert-performed hair transplants. Using advanced techniques like FUE, we ensure permanent.

Hair Patch
Get an instant makeover with our undetectable, non-surgical hair patches. Custom-designed to match your scalp.

Laser Hair Reduction
Say goodbye to unwanted hair with advanced laser hair reduction. Safe, effective, and virtually painless.
Who We Are
Since 1988, Berkowits has been a pioneer in modern hair and skin treatments in India. We're proud to have been the first to introduce Permanent Hair Removal, launch Non-Surgical Hair Replacement, and bring Robotic Hair Transplant Technology to the NCR. Thousands have trusted us with their transformation — and now, we'd be honored to earn your trust too.


Who We Are
Since 1988, Berkowits has led the way in modern hair and skin treatments in India. We're proud to be the first to introduce Permanent Hair Removal Launch Non-Surgical Hair Replacement Bring Robotic Hair Transplant Technology to NCR Thousands have trusted us—and now we'd be honored to earn your trust too
Meet Your Experts
Our experienced doctors and specialists aren’t just trained—they’re passionate about helping you feel and look your best. From your first consultation to your last follow-up, you’ll be guided by professionals who truly care.
Dr. Anupriya Goyal
Medical Director (MBBS, MD, DPD, UK)
An Aesthetic Dermatologist, she is the Medical Director of Berkowits Hair and Skin Clinics, a chain of 20 clinics across the country. A team of more than 200 technicians and paramedical staff work under her guidance. She is a certified national trainer for Allergan, Restylane, and Mint, and an international trainer and KOL for Regenera Activa — a progenitor stem cell treatment for hair. She is an avid educator, regularly posting educational content and videos through her YouTube channel and Instagram account with more than 2 lakh followers. Author of the popular skincare book “How To Get Glass Skin” published by Penguin Random House, she has also written more than 10 case reports, case studies, and research articles on aesthetics in national and international journals.
An Aesthetic Dermatologist, she is the Medical Director of Berkowits Hair and Skin Clinics. A team of 200+ technicians work under her guidance. She is a national trainer for... Read More

Nationwide Presence
49+ Clinics in 19+ Cities


Don't Just Take Our Word
10 Lac+ Happy Clients
Bhakti Sheth
Fantastic Results
Perfect laser hair removal experience! Quick, painless, and effective. Smooth skin with significant reduction in hair growth. Highly recommend! Kudos to Hema and technician Nisha for their service😃
Husaina Yousuf
Absolutely natural look!
I was thinking that the patch would look artificial, but the look that came out was so natural that I did not even feel the hair patch or treatment
Kanishka Rakha
Great pricing!
After visiting many places, I can say this was the best decision. The team made the entire hair patch process so easy and comfortable. Great quality, good pricing, and awesome service.

Download apps
Healthy Hair, Glowing Skin—One Tap Away!
Download the Berkowits App Today
Glow Up with the Berkowits App – Your Personal Gateway to Expert Hair & Skin Care, Anytime, Anywhere
Frequently Asked Questions
Absolutely. You can book a consultation—online or in-clinic—and our experts will guide you through the options that best suit your specific concerns.
All our treatments are clinically tested and approved by qualified dermatologists and medical professionals.
Yes, the AI Hair Generator tool is completely free for all users to try hairstyles virtually.
No, you can begin with an online consultation and visit the clinic later if needed.
The AI Hair Generator shows how different hairstyles will look on you, while the AI Hair Analysis helps assess your hair health and recommend suitable treatments.
Yes, we offer online consultations so you can get started without visiting in person.
Absolutely. You can book a consultation—online or in-clinic—and our experts will guide you through the options that best suit your specific concerns.
All our treatments are clinically tested and approved by qualified dermatologists and medical professionals.
Yes, the AI Hair Generator tool is completely free for all users to try hairstyles virtually.
No, you can begin with an online consultation and visit the clinic later if needed.
The AI Hair Generator shows how different hairstyles will look on you, while the AI Hair Analysis helps assess your hair health and recommend suitable treatments.
Yes, we offer online consultations so you can get started without visiting in person.






